User talk:Haris: Difference between revisions
m (→Gsoc_2016) |
m (→Gsoc_2016) |
||
Line 8: | Line 8: | ||
The aim of this project is to recover from the network failure, and complete the migration process. The project will include completing the process of sending the leftover memory pages. | The aim of this project is to recover from the network failure, and complete the migration process. The project will include completing the process of sending the leftover memory pages. | ||
'''To Do''' | '''To Do List''' | ||
Under Construction | Under Construction |
Revision as of 16:19, 26 April 2016
Gsoc_2016
Abstract
Live Migration is a process of moving a running virtual machine from one physical system to another. There are usually two ways, precopy and postcopy. Postcopy migration is used for virtual machines which have a high memory dirtying rate, (higher than the bandwidth of the network that will be used to perform migration). The disadvantage of postcopy migration is, if there is a network failure then we are left with an inconsistent vm at both the source and the destination side.
The aim of this project is to recover from the network failure, and complete the migration process. The project will include completing the process of sending the leftover memory pages.
To Do List
Under Construction